Desmond Tutu Enterprises LLC

Landscape Materials Coverage

Gravels, Sand & Soils, Mulches

162 sq. ft. @ 2″ depth per cubic yard
128 sq. ft. @ 2 ½” depth per cubic yard
108 sq. ft. @ 3″ depth per cubic yard
81 sq. ft. @ 4″ depth per cubic yard

Pine Straw Bales

30-50 square feet per bale @ 2″ + –

Bags & Buckets

A ½ cubic foot bag of gravel will cover 2.37 sq. ft. @ 2 ½” depth
A 1.15 cubic foot bag of rubber mulch will cover 6.9 sq. ft. @ 2″ depth
A 2 cubic foot bag of mulch will cover 9.48 sq. ft @ 2 ½” depth
A 3 cubic foot bag of mulch will cover 14.22 sq. ft. @ 2 ½” depth
A ¾ cubic foot 5 gallon bucket of material will cover 3.56 sq. ft. @ 2 ½” depth

MATERIAL CONVERSIONS

1 Cubic Yard Equals:

27 cubic feet
(54) ½ cubic foot bags
(36) 5 gallon buckets
(23.5) 1.15 cubic foot rubber mulch bags
(13.5) 2 cubic foot mulch bags
(9) 3 cubic foot mulch bags

Tons Per Cubic Yard: Gravels

Lava Rock (all) = .5 tons (1000 lbs.) per cubic yard
Eastern Sunrise = .9 tons (1800 lbs.) per cubic yard
Crimson = 1.1 tons (2200 lbs.) per cubic yard
Rock (57 & 89) = 1.2 tons (2400 lbs.) per cubic yard
Lime Rock (919) = 1.25 tons (2500 lbs.) per cubic yard
River Rock (all) = 1.325 tons (2650 lbs.) per cubic yard
Granite (all) = 1.325 tons (2650 lbs.) per cubic yard
Marble (all) = 1.35 tons (2700 lbs.) per cubic yard

Cubic Footage Per Ton Of Building Stone & Flagstone

15 cubic feet per ton*
or 133 lbs. per cubic foot*

*Note: The true cubic footage weights are 145-160 pounds per cubic foot, for solid unbroken stone, or about 13 cubic feet per ton on average. Being unlikely that you will be able to stack the stone that tightly, using the true numbers would result in an erroneous quantity being delivered to your site, further resulting, upon completion of the job, in hostile thoughts being pointed in our general direction, therefore, we have adjusted this number to be more consistent with reality in order to circumvent those aforementioned hostile thoughts and have happy customers in perpetuity. So you don’t have any leftovers we thought it best this way.

MATERIAL FORMULA BASICS

Convert all measurements from feet and inches into their decimal equivalent in feet only.

Example: You have a measurement of 6′ 9″
(9″/12″) + 6′ = 6.75′

Formulas

Square Footage (squares & rectangles)
(length x width) = Square Footage

Square Footage (circles)
(radius x radius) 3.14159 = Square Footage

Square Footage (right triangles)
(1/2 x width) length = Square Footage

Cubic Footage
(square footage x depth) = Cubic Footage

Cubic Yardage
(cubic footage / 27) = Cubic Yardage

Circumference of a circle
(diameter) 3.14159 = Circumference

MATERIAL CALCULATE QUANTITY NEEDED

Gravel, Mulch, Sand & Soils

Figure out the square footage to be covered
Multiply the square footage by the depth desired to get the cubic footage
Divide the cubic footage by 27 to get the cubic yards needed

Example: A rectangular landscape bed is 12′ 8″ long and averages 5′ 6″ wide and the depth desired is 2 ½” deep.

(12.66′ x 5.5) = 69.3 square feet
(69.3 x .208) = 14.414 cubic feet
(14.414 / 27) = .534 cubic yards needed

Flatwork (Patios, walls, etc.)

Figure out the square footage to be covered
Get the coverage per ton of the product desired
Divide the square footage needed by the coverage per ton

Example: A patio or wall is 20′ long and 8′ wide or high and you would like to use Buff Patio flagstone that has a coverage of 110-130 square feet per ton.
(20′ x 8′) = 160 square feet
Average coverage is 120 square feet per ton
(160 / 120) = 1.333 tons needed

Stacked Stone Walls & Waterfalls

Determine the average length, the average height and the average width of the stone in feet
Multiply the length by the width by the height to get the cubic footage
There is about 15 cubic feet in a ton of building stone or flagstone so divide the cubic footage by 15 to determine the quantity of stone needed in tons

Example: A 20′ long stacked stone wall that is 1′ thick and 2′ tall
Length = 20′, Height = 2′, Width = 1′
(20′ x 2′ x 1′) = 40 cubic feet
(40 / 15) = 2.667 tons of stone needed

 

VISIT THE MULCH / LANDSCAPE MATERIAL CALCULATOR HERE TO SEE WHAT YOU NEED!

 

 

INSTALLATION 

We charge an additional $75.00 PER YARD to install this product. For instance, if you buy three yards of a product at $40 per yard, you will pay $120.00 for the product and $225.00 for us to spread it. This is for installation only and does not include any ground preparation. There is a three yard minimum for installation services. Installation costs cannot be refunded.

Shipping policy

Our Shipping and Delivery Policy is as follows:

Before ANY DELIVERY can be received, our “Delivery Agreement Form” must be completed. We will not deliver if the form is not completed.

1. As always, Desmond Tutu Enterprises will deliver to requested jobsite or address. Jobsite conditions are not always suitable for placement, therefore it is expected the buyer provide suitable points of placement. Desmond Tutu Enterprises will not assume liability for damage to property beyond curbsideDesmond Tutu Enterprises reserves the right to refuse placement of material in areas driver deems inaccessible or unsuitable. A waiver must be signed for deliveries requiring dumping or driving over a paver driveway.

2. At checkout, you may select your products to be delivered. Please provide delivery preferences in the comment box provided at checkout.

***Please note that bulk items are delivered in a dump truck.***

If two bulk items are requested to deliver and only one delivery fee is purchased contamination or mixing of the products upon dumping is likely. Purchase an additional delivery fee if you choose to have more than one bulk product delivered and you are not wanting them to mix.

3. Bulk Delivery Capacities and Minimums

Bulk Mulch: 1-20 yards per delivery fee

Bulk Sand, Gravel, Soil, Shell, Roadbase, Crushed Concrete: 1-10 yards per delivery fee

4. If more than one type of bulk material is necessary (and mixing is understood as a factor) the sum of bulk material yardage must not exceed amount of the heaviest material yardage maximum on order. Example: Bulk mulch and bulk soil must not exceed a total of 10 yards because bulk soil maximum is 10 yards